Oak Lawn, Illionis
A new patient tower was constructed as part of the Medical Center’s expansion and plans required the existing parking structure to be demolished and be replaced with this new 780 space 7-level precast concrete parking structure.
Walker provided full design services including architectural, structural, functional, M/E/P and fire protection. The team utilized the design-build project delivery system. A pedestrian bridge connects the parking structure to the new patient bed tower and expansion and provides spaces to be used by patients and visitors.
Charlotte, North Carolina
Planning, Operations & Technology, Operations & Technology, Parking Design
Los Angeles, California
Planning, Planning, Operations & Technology, Operations & Technology, Parking Design
Elmont, New York
Curb Management, Planning, Operations & Technology, Parking Design
White Plains, New York
Parking Structure Restoration, Planning, Operations & Technology, Parking Design
Tempe, Arizona
Operations & Technology, Parking Design
Boston, Massachusetts
Planning, Operations & Technology, Parking Design
Columbus, Ohio
Parking Design
Nashville, Tennessee
Operations & Technology, Parking Design
San Francisco, California
Operations & Technology, Parking Design